Project
Description: Golden Urban Renewal Authority (GURA) is
seeking the services of a qualified contractor for the
purpose of retrofitting the existing lighting systems of
GURA’s two parking structures with upgraded energy efficient
systems. In addition, the contractor will make improvements
to a public restroom to maximize efficiency and decrease
energy consumption.
Description of
Area:
Gateway
Station is a 96,096 square feet (SF) parking garage and is
located at 1250 Jackson St. Clear Creek is a 100,996 (SF)
parking garage located at 702 12th Street. The public
restroom is 587 square feet (SF) and located adjacent to the
Astor House Museum on 12th Street.
The purposes of the
proposed upgrades are to:
1. To bring
the energy consumption of Gateway Station and Clear Creek
Parking Garages and the restroom down as much as reasonably
possible.
2. Provide optimal lighting for all structures without
consuming excessive energy.
Scope of Services:
The contractor will provide an outline of a base bundle
of services and recommendations along with options for
retrofitting or replacing the existing lighting fixtures
with LED, fluorescent, other, or a combination of light
systems. The contractor will retrofit the existing lighting
infrastructure in both the Gateway Station and Clear Creek
parking structures with upgraded energy efficient lighting
elements including bulbs, ballasts, and lighting controls.
The contractor will inspect and test all existing wiring and
terminals to safeguard the proposed upgrades. All upgrades
will provide adequate lighting to ensure public safety at
all times. The restroom will receive similar upgrades
regarding lighting and will receive building envelope
improvements to mitigate heating and cooling losses. Work
will include submitting a preliminary draft of energy
conservation measures, a budget of materials and labor, and
a proposed timeline.
Minimum
Requirements:
The contractor will include a lighting designer for the
lighting design and have a registered Electrical
Professional Engineer stamp and sign the drawings.
Contractors shall also provide submittals for all lighting
being considered. The submittals shall include the power
(Watts), efficacy (Lumens/Watt), Color Rendering Index
(CRI), and the Color Temperature (in Kelvin). Firms shall
have adequate staff and expertise to begin and complete work
within the projected timelines. Anticipated completion of
the final project is December 31, 2011.
Only responsive
proposals will be considered by the GURA, which reserves the
right to: